OPG’s Pickering storage structure for refurb waste gets the green light
Construct Connect Canada

AI Article Summary
The Canadian Nuclear Safety Commission has granted Ontario Power Generation permission to build and run the Pickering Component Storage Structure at the Pickering Waste Management Facility. This facility is essential for storing low and intermediate-level waste from the refurbishment of the Pickering Nuclear Generating Station units. The approval marks a significant step forward in managing nuclear project waste effectively.