La reconstruction du pont de l’île Bélair est terminée
Courrier Laval

AI Article Summary
The Ministry of Transport and Sustainable Mobility announced the completion of the reconstruction of the Bélair Island bridge. The bridge, which connects Route 117 between Bélair Island and Rosemère, features two lanes in each direction and a new multipurpose path for safe active transportation. The project cost 10.6 million dollars and used prefabricated factory products to minimize traffic disruption. Approximately 25,000 vehicles cross the bridge daily, and the reconstruction took a year to complete.