Tampa airport unveils design for $1.5B Airside D terminal
Construction Dive

AI Article Summary
Tampa Airport has revealed its plans for a new $1.5 billion terminal named Airside D, led by the construction company Hensel Phelps. The cost of this project has almost doubled since it was first proposed. The terminal is expected to be completed and operational in 2028.