|
/

    WSP to engineer Charlottetown’s expanded waste-to-energy facility

    Peter Saunders July 31, 2025 2 min read
    Canadian Consulting Engineer
    WSP to engineer Charlottetown’s expanded waste-to-energy facility
    AI Article Summary

    WSP is set to provide engineering and technical services for an expanded waste-to-energy facility in Charlottetown, replacing an existing district energy plant. The facility, designed to nearly double its current capacity, aims to divert 49,000 tonnes of municipal waste annually and reduce 908,000 tonnes of CO2e emissions by 2052. Construction is scheduled to begin in the fall, with operations commencing in 2028.

    More in Industrial