Travaux sur la dalle du pont Radisson dès la mi-juillet
Le Nouvelliste

AI Article Summary
The operations starting in mid-July on the Radisson bridge deck aim to prevent pothole formation and ensure the structure remains robust until its future refurbishment. In addition to ongoing deck repairs, the entire roadway will be re-asphalted to improve driving conditions.